Archives
Freight News, Sea
Port of LA and US Army Corps of Engineers Release Draft EIS/EIR for Everport Container Terminal
[ May 30, 2017 // Gary G Burrows ]The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the container terminal located at Berths 226-236 on Terminal Island at the Port of Los Angeles, operated by Everport Terminal Services, Inc. Everport, affiliated with Taiwan-based Evergreen Line, has a long-term lease with the Port for operation of the terminal through 2028, which would be extended 10 years.
The proposed project would improve the container-handling efficiency and capacity of the existing terminal to accommodate the projected fleet mix of larger container vessels that are anticipated to call at the Everport Container Terminal through 2038.
The Draft EIS/EIR includes a discussion of the proposed project’s environmental impacts and identifies mitigation measures to reduce these impacts as required under the California Environmental Quality Act (CEQA). In 2014, the Port released a Notice of Preparation/Notice of Intent (NOP/NOI) to prepare the Draft EIS/EIR. The Draft EIS/EIR includes all of the comments received during the NOP/NOI public comment period.
Tags: Port of Los Angeles, U.S. Army Corps of Engineers